• South Africa’s Bokpoort CSP plant breaks African record for around the clock operation

    Green energy

    South Africa’s Bokpoort CSP plant breaks African record for around the clock operation

    ACWA Power, a leading Saudi Arabian developer, investor and operator of power generation and desalinated water plants and lead shareholder in the Bokpoort CSP Plant, announced today that the Bokpoort CSP plant has become the first renewable facility on the continent to complete a full week of continuous round the clock operation. Bokpoort CSP set the new African continental benchmark achieving 13 days (312 hours) of continuous operations on 23 October 2020, almost double the previous record it had set in March 2016. This accomplishment was made possible by optimally managing 9.3 hours of the thermal salt storage system overnight, which allowed for a perfectly timed transition to the solar field every morning for the entire duration of this effort.

    The 50 MW concentrated solar power (CSP) plant with thermal storage was commissioned during the 2nd bidding window of South Africa’s Renewable Energy Independent Power Producer Programme (REIPPP) and has been setting consistent records since the commencement of its operation in 2016.


    Events

    SETAC Europe

    May 11 2025 Vienna, Austria

    SIEE Pollutec

    May 18 2025 Algiers, Algeria

    23rd International Water Management Exhibition

    May 20 2025 Prague, Czech Republic

    IFAT Brasil

    Jun 25 2025 Sao Paulo, Brasil

    View all events

    Great Job...
    The latest issue will be with you shortly, why not tell your colleagues at your company about us?
    Register for the latest products by eMail
    - Register to the eBulletin, a Monthly email packed with the latest Pollution Solutions products, news and services. Its FREE