• Concrete Effluent Tank Helps Hospital Meet New Environmental Standards

Water/Wastewater

Concrete Effluent Tank Helps Hospital Meet New Environmental Standards

A Sealwall Tank manufactured by Whites Concrete has become part of Rampton Hospital’s new Energy Centre in Nottinghamshire, which is operated and maintained under a Carbon Energy Fund framework contract.

Part of the new Energy Centre that provides heating, hot water and electricity to the Nottinghamshire Healthcare NHS Trust Hospital, Whites Concrete’s pre-cast concrete Sealwall Tank is a key component of Rampton’s new effluent treatment plant - now a modern, automated system that meets both current environmental standards and future expansion of the site.

Designed to ensure a watertight and robust connection between adjacent panels, Whites Concrete’s Sealwall is cast in segments with a specially designed jointing system. Offering key benefits over traditional construction, the precast Sealwall units undergo rigorous quality control during manufacture and also reduce build-time by up to 50%.

The hospital’s existing coal-fired boilers at have been replaced with a 1MW biomass boiler, a 1.2MW combined heat and power (CHP) engine and three high efficiency dual-fuel boilers running predominantly on gas. A new building management system has also been installed.

Under its framework contract, guaranteed specified carbon and energy savings are set to deliver projected financial savings of around £112,000 pa for the Trust. The new plant meets all of the hospital’s heating and hot water requirements and approximately 87% of the total electricity demand, reducing CO2 emissions by around 8,000 tonnes pa.


Events

Americana 2025

Mar 12 2025 Montreal, Canada

TECMA 2025

Mar 18 2025 Expo Santa Fe, Mexico

WASMA

Mar 18 2025 Moscow, Russia

Water Philippines

Mar 19 2025 Manila, Philippines

FLOWEXPO

Mar 20 2025 Guangzhou, China

View all events